Project Details
Description
Water from boreholes shall, if necessary, be discharged to the local stream at 4 locations to compensate for any potential lower flow in the stream as a result of extraction from a new well site. The water must be treated (for iron) before discharge. It is desired that the water treatment itself takes place at the discharge points to the stream without the use of electricity, so that raw water is pumped to the discharge location where the water treatment takes place. Additionally, it is desired that the facility is designed to ensure maintenance is practical for periodic operation.
| Status | Finished |
|---|---|
| Effective start/end date | 01/03/24 → 31/12/24 |
Collaborative partners
- DIN Forsyning (lead)
- VIA University College (Project partner)
Keywords
- technology, engineering and IT
- water treatment
- water quality
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Research output
- 1 Facility, construction or artefact
-
Vandbehandlingsanlæg til behandling af vand fra kompensationsboringer
Lund, M. D. (Developer) & Ramsay, L. M. (Developer), 20 Aug 2024Research output: Non-textual form › Facility, construction or artefact › Communication